Back to implementations

Access road to the construction of a wind farm

TASK

The construction of a wind farm presents many challenges. One of these is the transport of windmill components. The developer was looking for a quick and practical way to pave a road that would lead directly to the construction site, which is remote from transport infrastructure.

SOLUTION

The use of ROAD SYSTEM plates was an ideal solution in this situation. Compared to traditional methods of building temporary access roads, which are not only time-consuming but also costly, ROAD SYSTEM plates gain the advantage that they can be used repeatedly. Their assembly and disassembly is very easy, and no specialised equipment is needed for transport and unloading.

RESULT

The temporary access road and component storage area for the wind farm were completed in a short time. Thanks to the road plates, made from 100% recycled material, the whole investment is twice as environmentally friendly.

USED PRODUCTS
ROAD SYSTEM 200

Check where else you can use ROAD SYSTEM