Temporary Road for Bypass Construction

TASK


During the construction of the bypass, it was essential to strengthen a section of the road that would be used by heavy construction equipment, including a crane transporting bridge elements. The requirements called for a quick installation, sufficient durability, and the ability to handle multiple uses.

SOLUTION


For the construction of the temporary road, lightweight ROAD SYSTEM200 XL road plates were used. The process began with laying geotextile fabric to reinforce the ground and evenly distribute the load. Then, a string was used to mark the alignment of the plates, ensuring precise placement. The plates, being lightweight, could be easily moved by two people, which accelerated the installation process. The plates were connected using flat connectors and screws, ensuring the stability and durability of the structure.

RESULT


In just 4 hours, 100 meters of temporary road were constructed, allowing the safe passage of the heavy crane transporting the bridge elements. The solution met the project’s requirements quickly and efficiently, providing the necessary functionality and durability.

USED PRODUCTS
ROAD SYSTEM 200 XL

Check where else you can use ROAD SYSTEM