Back to implementations

Surface with ROAD SYSTEM 200 after one year of use

TASK

During the renovation of the Stefan Żeromski Theatre in Kielce, it was necessary to protect the existing historic paving.

SOLUTION

Plastic road plates 2 cm thick were used. By alternating assembly, sections of the desired widths and shapes were made.

RESULT

The ROAD SYSTEM plate pavement was used intensively for 10 months. During this time, more than 3,500 m3 of rubble and 6,500 m3 of soil were hauled away from the city centre. The plates have performed excellently in all seasons
and their condition, one year after laying, is virtually perfect.

USED PRODUCTS
ROAD SYSTEM 200

Check where else you can use ROAD SYSTEM