TASK

The contractor in Dziwnówek faced the challenge of creating a temporary access road that could withstand heavy traffic from machinery weighing up to 50 tons without damaging the existing surface.

SOLUTION

To meet this challenge, the ROAD SYSTEM 200 road panel system was used. Each panel, measuring 180 cm x 120 cm x 2 cm, is made from high-quality plastic and is characterized by exceptional durability and resistance to weather conditions. The panels were connected into a solid structure using special connectors, creating a stable and load-bearing surface.

RESULT

hanks to the use of ROAD SYSTEM 200 panels, a safe and durable access road was created, perfectly meeting the investment’s requirements. This system proved to be highly effective, even with intense traffic from heavy machinery. The load-bearing capacity of up to 50 tons guarantees safety for both the workers and the machinery on the construction site.

Additional Benefits:

  • Quick Installation: Due to the large size of the panels, the road was constructed efficiently and quickly.
  • Easy Removal: After construction is complete, the panels can be easily removed and reused at another site.
  • Minimal Environmental Impact: The ROAD SYSTEM 200 panels are made from recycled materials, making them environmentally friendly.

The ROAD SYSTEM 200 road panel system proved to be the ideal solution for the investment in Dziwnówek. Its technical features and ease of use significantly facilitated the construction process, ensuring both the safety and durability of the newly created road.