Protection of an athletics track in the Czech Republic.

During the reconstruction of the athletics hall at the stadium in Tabor, the problem arose of how to prevent damage to the outer part of the running track. The investor wanted the best possible protection for the sensitive tartan against heavy transport equipment.

The use of ROAD SYSTEM 200 road plates proved to be the ideal solution. Thanks to the low weight of the slabs, a two-man team was able to lay and assemble an area of 325 m2 in one day.