TASK

The requirement was to secure the soft ground during the urgent repair of a power station breakdown in winter when the ground is wet. This situation required a quick response and a professional approach to avoid serious damage or unpredictable situations that could negatively affect the operation of the entire station. It was necessary to apply appropriate technical solutions that would allow for effective repair while minimizing the impact of heavy equipment and machines on the ground.

SOLUTION

A road made of ROAD SYSTEM 200 plates was quickly laid, which secured the ground and enabled the crane to enter and exit the site. This made it possible to carry out the repair quickly.

RESULT

The repair was carried out without any problems, which allowed the power station to return to normal operation. However, in the long run, the use of ROAD SYSTEM 400 plates is definitely more effective as they are more durable and can be used on less solid grounds.

USED PRODUCTS
ROAD SYSTEM 200

Check where else you can use ROAD SYSTEM